Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Quarterly Report & Media Release | ASX: KAL | 30 January 2025
QUARTERLY ACTIVITIES REPORT
for the quarter ended 31 December 2024
Kalgoorlie Gold Mining Limited (ASX: KAL) (‘KAL’ or the ‘Company’) is pleased to report on its activities
during the December 2024 quarter.
The Company advanced the Pinjin Project significantly during the quarter, accelerating exploration and
identifying new gold mineralisation across three extensive areas for follow-up RC drilling. KalGold’s
exploration strategy continues to deliver strong results in the southern part of the underexplored and highly
prospective Laverton Tectonic Zone.
Highlights:
Company Gold Resources
•
Total JORC Code (2012) Inferred Mineral Resource inventory: 214,300 oz of gold from 3 m at
Kirgella Gift / Providence (Pinjin Project), and from surface at La Mascotte (Bulong Taurus Project).
Pinjin Gold Project, Laverton Tectonic Zone (140 km ENE of Kalgoorlie)
•
•
•
•
Completed four phases of aircore drilling, defining gold mineralisation at three priority prospects
for Reverse Circulation (RC) drilling as part of KalGold’s systematic exploration program.
o Wessex (Phase 2): Defined extensive, thick, gold mineralisation and anomalism spanning
a 2 km strike adjacent to Anglo Saxon Gold Mine (ASX: HAW).
o Providence South (Phase 2): Identified an 800 m long silica caprock ridge which precluded
penetration by aircore but is unusually associated with gold and strong arsenic anomalism.
o Kirgella West (Phase 3): Defined broad gold mineralisation and anomalism over 1,200 m
length and up to 320 m width. Phase 3 drilling was followed up with additional holes in
Phase 4, with assay results to be released imminently.
o Kirgella East (Phase 4): Tested a broad area, with results also expected imminently.
Detailed planning of RC drilling programs underway to evaluate the grade and extent of gold
mineralisation at priority prospects. Drilling is scheduled for early 2025.
o Confirming extensive, primary gold mineralisation at any of these prospects will be a major
milestone for the Company.
Acquired a new tenement for high prospectivity and to provide tenure continuity. Target generation
for future drilling programs underway.
Discussions on how best to execute the Pinjin project farm-in are underway as KalGold expects to
surpass its farm-in obligations at Pinjin upon completion of the upcoming RC drill program.
Corporate
•
•
Approximately $1.8 million cash with no debt as of 31 December 2024, following acceleration of
KalGold’s exploration programs. Costs this quarter included payment for three programs (Phases
2, 3, and 4 aircore programs) and a new aeromagnetic survey at Pinjin. Expenditure will moderate
in the March 2025 quarter.
Kalgold is well funded and ahead of schedule to satisfy its farm-in obligations at Pinjin.
Kalgoorlie Gold Mining Limited | ACN 645 666 164
Suite 2, 1209 Hay St, West Perth WA 6005, Australia
T: +61 (0)8 6002 2700 | E: info@kalgoldmining.com.au | www.kalgoldmining.com.au
Quarterly Operations Report, December 2024
Figure 1 – KalGold’s JORC Code (2012) Inferred Mineral Resources in the Eastern Goldfields of Western Australia,
to the east of Kalgoorlie-Boulder. Projection GDA94 MGA Zone 51.
COMPANY TOTAL GOLD RESOURCE
With the recent definition of the Kirgella Gift and Providence JORC Code (2012) Inferred Mineral
Resource, KalGold’s total JORC Code (2012) Inferred Mineral Resource base has increased to 214,300
ounces of gold (Table 1).
Table 1 – KalGold Total Mineral Resource statement. Bulong Taurus (La Mascotte) reported at a 0.6 g/t gold cutoff (7 March 2023), and the Pinjin (Kirgella Gift and Providence) reported at a 0.5 g/t gold cut off (25 July
2024). Totals may not sum due to rounding. The Company confirms that the material assumptions and
technical parameters underpinning the JORC Code (2012) Inferred Mineral Resources Estimates continue to
apply and have not materially changed.
Classification
Inferred
Project
Tonnes (Mt)
Au Grade (g/t)
Au (oz)
Discovery Cost
per ounce
Bulong Taurus
3.61
1.2
137,900
A$4.79
Pinjin
2.34
1.0
76,400
A$4.18
Total
5.95
1.1
214,300
$4.57
KalGold’s gold resources are either outcropping or located within metres of surface. At both Pinjin
(Kirgella Gift, Providence) and Bulong Taurus (La Mascotte) (Figure 1), overall gold grades exceed 1.0 g/t
Au, with both projects containing zones of higher-grade, near-surface gold mineralisation that may be
amenable to open pit mining.
Page 2
Quarterly Operations Report, December 2024
PINJIN GOLD PROJECT
During the December quarter, KalGold accelerated exploration at Pinjin. This resulted in aircore drill testing
of multiple targets, with the completion of two additional aircore programs. Over 11,000m of aircore drilling
have been completed at Pinjin to date (Table 2).
Table 2 – Targets tested with aircore drilling at the Pinjin Project by KalGold. Results from Phase 2 were
reported during the quarter, with drilling of the Phase 3 and Phase 4 programs completed during the
quarter. Bolded targets are priority for RC drill testing to confirm primary gold mineralisation to depth.
Results for the Phase 4 program are pending.
Drill
program
Tested
target
Total
metres
No.
holes
Phase 1
Wessex
1,349
15
Discovery of shallow gold mineralisation near the
Anglo Saxon Gold Mine.
Harbour Lights
394
16
Anomalies require further investigation
Wessex
2,885
42
Extension of strong anomalism and mineralisation
over 2 km of strike.
Kirgella North
204
5
Testing Au anomalism just north of the Kirgella
Gift deposit.
Providence
South
648
20
Au and As anomalism with silica caprock
precluding testing of main target
Phase 3
Kirgella West
3,518
63
Extensive gold mineralisation and anomalism
centred 1.2 km west of Kirgella Gift.
Phase 4
Kirgella West
319
5
Kirgella East
1,966
60
11,283
226
Phase 2
Total
Comments
Results to be released imminently.
These widely spaced, shallow, cost-effective programs successfully resulted in discovery of previously
unknown gold mineralisation and anomalism over extensive areas at Pinjin. Results for the Phase 2 aircore
program at Wessex and Phase 3 program at Kirgella West were published during the quarter. Results for
the Phase 4 program are expected shortly.
Discovery of gold mineralisation for RC drill testing at Pinjin
The newly discovered, shallow-level, gold mineralisation at Pinjin requires testing of its extent to depth by
RC drilling. Confirmation of extensive primary gold mineralisation would be a major milestone for the
Company. RC drilling will focus on the following areas:
•
Wessex – approximately 2,000 m strike length with gold concentrations at the northern and
southern ends of the trend. Dip is easterly, shows indications of both steep and moderate dips,
similar to the nearby Anglo Saxon Gold Mine.
•
Providence South – 800 m strike length of gold and arsenic anomalism associated with a silica
cap that precluded penetration by aircore drilling, adjacent to the Kirgella Gift and Providence
JORC Code (2012) Inferred Mineral Resource.
•
Kirgella West – over 1,200 m of strike length from around 800 m west of Kirgella Gift, with
additional data pending.
RC drill program design and planning are currently in progress to test KalGold’s most prospective gold
discoveries in early 2025. For details on KalGold’s systematic discovery strategy at Pinjin, see this video.
Page 3
Quarterly Operations Report, December 2024
Figure 2 – Priority RC drill targets (red) at Pinjin
defined by successful aircore drill programs
that have intersected gold mineralisation and
anomalism. These are overlain on aircore
target areas (yellow) which continue to be
tested. Gold deposits at Kirgella Gift and
Providence shown with HAW’s Anglo Saxon
gold mine. RC drill programs are currently
being planned in detail. Projection GDA94
MGA Zone 51.
Wessex: 2 km long mineralised zone defined for RC follow-up testing
Two phases of aircore drilling defined gold mineralisation at Wessex. Results from the second program
were released during the quarter. Phase 2 drilling confirmed extensive, thick, gold mineralisation and
anomalism over approximately 2 km of strike (Figure 3), located within 1 km of the Anglo Saxon open pit
gold mine (off tenure). Significant drill intercepts from Phase 2 are presented in Table 3.
Table 3 – Significant drill intercepts from KalGold’s Phase 2 aircore drilling at its Wessex prospect.
Intercepts are calculated at >0.1 g/t gold with maximum internal waste of 4m.
PSAC24065
PSAC24067
PSAC24072
8 m at 0.94 g/t Au from 36 m
including 4 m at 1.72 g/t Au from 36 m
16 m at 0.77 g/t Au from 28 m
including 4 m at 2.37 g/t Au from 28 m
4 m at 2.06 g/t Au from 52 m
including 3 m at 2.69 g/t Au from 52 m
Page 4
Quarterly Operations Report, December 2024
Figure 3 – KalGold’s aircore drill results at Wessex (circles) with verified historic drilling (triangles) and other historic collar
locations (crosses). KalGold drilling has extended gold mineralisation and anomalism over 2 km strike. Total cumulative gold
content is contoured from 1 g/t metre and above and preferentially stretched along interpreted structures according to current
geological understanding of the area. Drill cross section locations (Figure 2) are shown in blue. Off tenure collar locations
sourced from Hawthorn Resources WAMEX Report A91361. Projection: MGA 94 Zone 51.
These results align with and support KalGold’s earlier Phase 1 findings at Wessex, confirming continuity
of gold mineralisation (Table 4).
Table 4 – Intercepts reported previously from KalGold’s first aircore drill program at Wessex (ASX: KAL
23 May 2024)
PSAC24001
PSAC24029
28 m at 1.27 g/t Au from 36 m
including 8 m at 1.90 g/t Au from 44 m
and 8 m at 2.15 g/t Au from 56 m
12 m at 1.17 g/t Au from 52 m
including 4 m at 3.07 g/t Au from 56 m
Gold mineralisation at Wessex remains open to the north and extends to the tenement boundary in the
south. It appears to cluster around the contact between a mafic and felsic-intermediate unit, corresponding
with common gold mineralisation indicators like quartz veining, iron-staining, shearing, and alteration.
Page 5
Quarterly Operations Report, December 2024
A shallow easterly dip has been interpreted for at least part of the gold mineralisation at Wessex and bears
similarities to the neighbouring high-grade Anglo Saxon deposit, which has a JORC Code (2012) Mineral
Resource Estimate of 157 koz at 6.1 g/t Au (ASX: HAW 30 October 2020).
Providence South: 800 m long gold target next to Providence deposit
Providence South is approximately 800 m long and located immediately west and south of the
Providence and Kirgella Gift deposits. Phase 2 aircore drilling targeted an ultramafic unit that is interpreted
as a fault-offset continuation of the ultramafic host to gold mineralisation at Kirgella Gift and Providence
(Figure 4). Key features characterising this RC drill target include:
• A distinct siliceous cap rock ridge defined by shallow aircore drill holes unable to penetrate the
target to depth, corresponding to a strong magnetic ridge.
• Gold and coincident arsenic anomalism on the periphery of the cap rock ridge
Figure 4 – Arsenic anomalism at Providence South. The left map shows hole depth throughout the program relative to
gold mineralisation at Kirgella Gift and Providence (resource model triangulations shown). Both the gold mineralisation
and shallowest hole depths correlate with fault offset fragments of the magnetic ridge that correlates with an ultramafic
unit. In the right image, all available arsenic values show three things – 1. correlation with gold mineralisation at Kirgella
Gift and Providence, 2. Correlation with the magnetic ridge, and 3. correlation with gold and shallow drill holes. A silica
cap rock that has developed over the ultramafic rock stopped aircore drillholes penetrating to the gold target beneath.
This strengthened gold target will require testing by RC drilling. Projection: MGA 94 Zone 51.
Page 6
Quarterly Operations Report, December 2024
Arsenic often serves as a pathfinder for gold mineralisation throughout the Eastern Goldfields of WA. At
Providence South, arsenic peaks at a very high value of 14,500 g/t where it correlates with gold
mineralisation (4 m at 0.13 g/t Au from 48 m, KGAC24017). These arsenic values are more than ten times
the maximum values associated with gold mineralisation at Kirgella Gift and Providence (where arsenic
values are typically low).
Figure 4 shows the distribution of known gold mineralisation in the area, the distribution of shallow aircore
drill holes at Providence South (left image), and arsenic mineralisation in the area (right image). All these
features align with the disrupted magnetic ridge associated with the faulted ultramafic unit, which also
hosts gold mineralisation at Providence and Kirgella Gift. These indicators suggest that primary gold
mineralisation could be present underneath the silica cap.
Kirgella West: 1,200m long wide zone of gold mineralisation and anomalism
Aircore drilling at Kirgella West was completed and results returned during the quarter, defining gold
mineralisation and anomalism over 1,200 m strike and up to 320 m width, directly west of the Kirgella Gift
deposit. In total, 16 of the 63 drill holes drilled (25%) returned significant gold anomalism, a very positive
result for first-pass aircore drill testing. Gold results are supported by co-incident pathfinder anomalism in
arsenic, copper, zinc, potassium, rare earths, and others.
Figure 5 – KalGold’s aircore drill results at Kirgella West with verified historic drilling. New drilling has defined irregular and
likely structurally controlled gold mineralisation and anomalism over 1,200 m strike. Projection: MGA 94 Zone 51.
Page 7
Quarterly Operations Report, December 2024
Significant intercepts include:
•
KGAC24045: 8 m @ 2.29 g/t Au from 60 m, including 4 m at 3.66 g/t Au from 64 m
•
KGAC24036: 4 m @ 1.05 g/t Au from 52 m
•
KGAC24087: 8 m @ 0.59 g/t Au from 48 m, including 4 m @ 1.02 g/t Au from 48 m
An additional five aircore holes were completed at Kirgella West at the end of the Phase 4 program to
extend and infill coverage on a single drill line. Initial aircore results at Kirgella West show gold
mineralisation and anomalism to the north and south of the additional drill holes, with distinct features
evident in the geophysics that may control gold distribution. Results are pending for these five drill holes.
Phase 4 aircore program, Kirgella West and Kirgella East
A total of 60 holes for 1,966 m (average depth: 33 m) were completed at Kirgella East on a nominal
320x80 m grid pattern. Total metres were less than expected due to shallow transported cover. This
allowed the Company to remain within budget and revisit Kirgella West to complete the additional 5 holes
discussed above for 319 m (average depth: 64 m).
Assay results from the recently completed aircore program at Kirgella East are expected early February
2025.
Pinjin Farm-In update
The Pinjin farm-in incorporates a minority portion of the tenure that comprises the Pinjin Gold Project. Of
the 16 tenements covering around 360 km2, 9 of the tenements (including 2 small applications) totalling
321 km2 are 100% controlled by KalGold. The farm-in tenure constitutes 7 tenements for 39 km2 and
includes gold deposits at Kirgella Gift, Providence and gold mineralisation discovered by KalGold at the
priority prospects of Wessex, Providence South, and Kirgella West.
KalGold is meeting its obligations to execute the farm-in
The farm-in agreement (ASX: KAL 23 May 2023) requires drilling expenditure of $1.4 million on drilling,
assays, and associated costs. KalGold expects to surpass this threshold with the upcoming RC drill
program. This will position the Company well to be able to execute the farm-in prior to the May 2025
completion date. Cooperative discussions with the vendors on how best to execute the farm-in have
commenced.
Vendor tenement management
Additionally, during the quarter, the farm-in vendors took steps to address expiry of several Prospecting
tenements (Ps). Through their efforts, KalGold has retained working title over the affected tenements near
Wessex. There is zero net effect on the farm-in and on KalGold with tenement amalgamation and reversion
of some Ps to their underlying Special Prospecting Licences (SPLs) considered standard DEMIRS
operating procedure. See the Tenement Schedule at the end of this document for more details.
New tenement acquired by KalGold at Pinjin
A new tenement (E 31/1262) was 100% acquired by KalGold from Solstice Minerals Limited (ASX: SLS)
during the quarter (Figure 6). Located immediately west of KalGold’s Wessex prospect and Hawthorn
Resources’ (ASX: HAW) Anglo Saxon gold mine, the acquisition provides tenure continuity through much
of the Pinjin Gold Project, linking ground south of the Pinjin Goldfield (containing Wessex, Kirgella Gift–
Providence, and all aircore targets tested to date) to the Jungle Dam tenement to the west (E 31/1119).
Page 8
Quarterly Operations Report, December 2024
A consideration of A$70,000 worth of KalGold shares was issued to SLS a 2.5c per share (the 5-day
VWAP at the time) with a 1% net smelter royalty (NSR) on any future production.
E 31/1119
GALVALLEY
MONZOGRANITE
Figure 6 – KalGold’s tenement package at Pinjin, with the recently acquired tenement, E 31/1262, outlined in red dashed lines.
The map shows GSWA interpreted bedrock geology comprising the Galvalley Monzogranite in the west (pink) through a
sequence dominated by sedimentary and volcanic rocks. Projection: MGA 94 Zone 51.
Aeromagnetic survey over Jungle Dam area, northern E 31/1119
During the quarter, the Company completed acquisition of a high-resolution aeromagnetic geophysical
survey over the northern section of the Pinjin Project.
This new dataset provides detailed aeromagnetic data over the Jungle Dam area and the lateral extension
of the Edjudina Goldfield in the northern portion of KalGold’s 100%-owned E 31/1119. It will support the
identification of detailed gold targets in the northern section of the Pinjin Project. Within the survey area,
known sites of gold mineralisation include the Jungle Dam prospect, an underexplored anomalous
Page 9
Quarterly Operations Report, December 2024
northwest-southeast trending structure through the ovoid-shaped Jungle Dam Granite. KalGold will
leverage its targeting expertise over the Jungle Dam Granite and the adjacent greenstone sequence,
where extensive transported cover has thus far limited effective drilling. The interaction of the Jungle Dam
Granite with the enveloping Laverton Tectonic Zone is regarded as a significant opportunity for gold
mineralisation whose potential has been obscured until now by a blanket of transported cover.
EIS government co-funding awarded to KalGold for Pinjin Project
KalGold was awarded $130,000 in co-funding through the Western Australian Government’s Exploration
Incentive Scheme (EIS).
These funds will support four diamond drill holes at Kirgella Gift and Providence, totalling 1,070 m. Planned
diamond drilling aims to define key structural data at both deposits and will test a high-grade gold
exploration target at depth between the two deposits.
Funding is available from December 2024 for a 12-month period. EIS diamond drilling will be scheduled
to align with both active and planned aircore and RC drill programs, supporting systematic target testing
throughout the Pinjin Gold Project.
New tenement applications
Two new exploration licence applications, E 31/1377 and E 31/1378, are currently progressing through
the granting process. The Company will update shareholders as these applications progress.
Other operators in the region
During the quarter, neighbour Ramelius Resources released a pre-feasibility study on the Rebecca Project
(ASX: RMS 12 December 2024). Key points of the study include:
•
•
•
•
Open pit and underground plans for a long-lived gold project.
Three million tonne per annum processing plant located adjacent to the Rebecca deposit.
Mining commencement in September 2026, with production commencing July 2027.
Definitive Feasibility Study underway with Final Investment Decision targeted for July 2025.
Importantly for KalGold, Ramelius noted that they will assess business development opportunities
within trucking distance. A future processing plant within 25 km of our Pinjin Gold Project could
potentially significantly change the economics of any gold deposits defined due to low transport costs. This
can mean that either lower grades could be economically mineable or that higher grades could be more
profitable.
It also shows that the area is receiving deserved attention for its gold potential, and KalGold is at the
absolute forefront of taking advantage of this due to its dominant tenement holding in an area that remains
highly prospective, but under explored.
BULONG TAURUS GOLD PROJECT
Work continues at Bulong Taurus. An updated heritage survey over the Bulong Taurus project area is
necessary to advance the project further. KalGold continues to work with key stakeholders for an updated
heritage survey whilst recognising current conditions have seen larger projects by bigger companies
receiving priority.
Page 10
Quarterly Operations Report, December 2024
Application for a new mining licence (M 25/377) continues to advance through the application process.
Advancement on both these fronts will assist KalGold to generate future cashflow at La Mascotte. A pod
of shallow, oxide gold mineralisation defined at La Mascotte within the current JORC Code (2012) Inferred
Mineral Resource is potentially well-suited to a small mining operation. The Company notes that a similar
shallow mining operation is underway at Black Cat’s (ASX: BC8) neighbouring Kalgoorlie East Project,
centred on the Myhree deposit. Discussions continue with several parties that have expressed interest in
the project.
OTHER PROJECTS
Reconnaissance, mapping and surface sampling activities progressed at most projects during the quarter,
with no material results reported.
CORPORATE
Finance and Use of Funds
The Company’s cash position was approximately $1.8 million at 31 December 2024.
Expenditure incurred on exploration activities during the quarter was approximately $547,000. This
included the most recent drill program and tenement rents and rates. This expenditure is expected to
reduce in the March 2025 quarter.
No expenditure was incurred on mining production or development activities.
Payments totalling approximately $126,000 were made to related parties, as reported in the attached
Appendix 5B comprising directors’ fees and salary.
Authorised for lodgement by the Board of Kalgoorlie Gold Mining Limited.
For further information regarding KalGold, please visit kalgoldmining.com.au or contact:
Matt Painter
Managing Director and Chief Executive Officer
Tel +61 8 6002 2700
Page 11
Quarterly Operations Report, December 2024
About KalGold
ASX-listed resources company Kalgoorlie Gold Mining (KalGold, ASX: KAL) is a proven, low-cost
gold discoverer with a large portfolio of West Australian projects and a total gold resource in excess
of 214,000 oz. KalGold prides itself on defining shallow, potentially open-pittable gold resources at
very low costs, currently less than A$4.60 per ounce of gold2. Current focus includes:
•
The Pinjin Project within the 30Moz Laverton Tectonic Zone (host to
Sunrise Dam, Granny Smith, Rebecca, Anglo Saxon, and Wallaby
projects) is located only 25 km north along strike from Ramelius
Resources (ASX: RMS) Rebecca Gold Project. A first
JORC Code (2012) Inferred Mineral Resource at Kirgella Gift
and Providence (2.34 Mt @ 1.0 g/t Au for 76,400 oz 1)
represents the first area targeted by the Company, with
many more targets scheduled for testing. The company
aims to define further resources as these targets are
tested. Some tenure is the subject of a farm-in over two
years. Between this tenure and KalGold’s own tenure and
applications, the Company has established a significant
presence in a strategic and important gold producing region.
•
The Bulong Taurus Project, 35 km east of KalgoorlieBoulder. Contains the outcropping La Mascotte gold
deposit where KalGold has defined a JORC Code (2012) Inferred Mineral Resource
of 3.61 Mt @ 1.19 g/t Au for 138,000 oz 2, plus a series of satellite prospects and
historic workings of the Taurus Goldfield. Work continues at the project
Follow KalGold on social media
1 See KalGold ASX release, “First Kirgella Gift Inferred Resource of 76,400oz from 3m”. 25 July 2024.
2 See KalGold ASX release, “La Mascotte gold deposit: First JORC (2012) Mineral Resource of 138,000 oz Au”. 7 March 2023.
Page 12
Quarterly Operations Report, December 2024
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements and forward-looking information within the meaning of applicable
Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.
This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to
management’s expectations with respect to, among other things, the timing and amount of funding required to execute the
Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any
changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits,
certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s
properties, environmental risks, the availability and mobility of labour, the focus of the Company in the future, demand and market
outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise
funding privately or on a public market in the future, the Company’s future growth, results of operations, restrictions caused by
COVID-19, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”,
“expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking
information is based on the opinions and estimates of management at the date the information is given, and on information
available to management at such time.
Forward-looking information involves significant risks, uncertainties, assumptions, and other factors that could cause actual results,
performance, or achievements to differ materially from the results discussed or implied in the forward-looking information. These
factors, including, but not limited to, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company
to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls,
regulations, political or economic developments in Australia or other countries in which the Company does business or may carry
on business in the future, operational or technical difficulties in connection with exploration or development activities, employee
relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing
quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent
risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and
other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and
flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and
should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could
cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf
of, the Company. Prospective investors should not place undue reliance on any forward-looking information.
Although the forward-looking information contained in this news release is based upon what management believes, or believed
at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be
consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated,
estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness
of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any
such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except
as may be required by law.
No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved
the information contained in this news release.
COMPETENT PERSON STATEMENT
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Dr Matthew Painter, a Competent Person who is a Member of the Australian Institute of Geoscientists.
Dr Painter is the Managing Director and Chief Executive Officer of Kalgoorlie Gold Mining Limited (KalGold) and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 edition of the Aust