QUARTERLY ACTIVITIES REPORT
for the quarter ended 31 March 2026
KalgoorlieGoldMiningLimited | ACN645666164
Suite 2, 1209 Hay St, West Perth WA 6005, Australia
T: +61 (0)8 6002 2700 | E: info@kalgoldmining.com.au | www.kalgoldmining.com.au
Highlights:
Pinjin Gold Project – Laverton Tectonic Zone (LTZ), 140 km ENE of Kalgoorlie
• First diamond drilling program at Kirgella Gift & Providence:
o Four EIS-funded diamond drill holes (1,070m) completed at Kirgella Gift and Providence
o Best intercepts include: 28 m at 2.24 g/t Au from 92 m (KGDD25004), including 8.5 m at
3.21 g/t and 9 m at 2.82 g/t Au
o Gold mineralisation now confirmed to 300 m vertical depth, 160 m below existing resource
envelope, with mineralisation remaining open at depth
o New north-south trending structures identified, guiding future deep drill targeting
• Drill programs underway in a concerted, multi-program approach to accelerate discovery:
o 41-hole RC program (6,850m) targeting Kirgella Gift–Providence resource extensions and
Lighthorse extension and infill
o Preparations are also underway for separate 4-hole diamond drill program (1800m) to test
deeper potential at Kirgella Gift and Providence, and for first-pass aircore reconnaissance
program (up to 215 holes, 10,750m) at the LTZ Flexure greenfields target
Corporate
• Balance sheet of $2.9 million cash and no debt as of 31 March 2026.
• Strong news flow with results of the current as well as upcoming drill programs.
In his summary of the quarter, KalGold Managing Director Matt Painter said:
“The March 2026 quarter delivered the Company’s first diamond drilling results at Kirgella Gift
and Providence and, in conjunction with recent RC drilling results, has laid the groundwork for the
Company's most comprehensive exploration campaign to date.
The four EIS-funded diamond drill holes have done exactly what we hoped – they have confirmed
that the primary orogenic gold system at Kirgella Gift extends well beyond the shallow envelope
of our existing resource. Mineralisation is now confirmed to 300 m vertical depth, 160 m below
the current resource limit. Critically, the new data has revealed a previously unrecognised set of
north–south trending, east-dipping structures that are already influencing our targeting for the
next phase of deep drilling. This is the kind of structural clarity that is difficult to achieve through
RC drilling alone, and which opens new avenues for resource growth.
Into the new quarter, we have commenced our largest ever drilling campaign. An RC rig is already
turning on site at Kirgella Gift. A diamond drill program is coming, and preparations are advanced
for a substantial aircore reconnaissance campaign over the largely unexplored Laverton Tectonic
Zone (LTZ) Flexure target. KalGold is systematically working through a structured pipeline of
discovery and resource growth opportunities throughout the LTZ at Pinjin which, in our view,
Page 2
QuarterlyOperationsReport,March2026
remains significantly under explored for a gold belt hosting several multi-million ounce gold
deposits.
PINJIN GOLD PROJECT
The Pinjin Gold Project is KalGold's flagship exploration asset, located approximately 140 km northeast of
Kalgoorlie-Boulder and covering a substantial portion of the southern Laverton Tectonic Zone (LTZ), a
crustal-scale shear corridor responsible for over 30 million ounces of gold production from world-class
operations such as Sunrise Dam, Granny Smith and Wallaby. KalGold's tenure sits approximately 20–
25 km north of Ramelius Resources' Rebecca Gold Project.
The project hosts a JORC Code (2012) Inferred Mineral Resource of 2.34 Mt @ 1.0 g/t Au for 76,400 oz
at a 0.5 g/t gold cut-off at the Kirgella Gift and Providence deposits, from only 3 m depth.
Figure 1 – Location map of KalGold’s Pinjin Project around 140 km northeast of Kalgoorlie-Boulder. The project is situated
approximately 25 km north of Ramelius Resources’ (ASX: RMS) Rebecca Gold Project. Also shown are KalGold’s JORC
Code (2012) Inferred Mineral Resources, the outcropping La Mascotte deposit 35 km east of Kalgoorlie, and the Kirgella
Gift and Providence deposits from only 3m depth at Pinjin. Projection: MGA 94 Zone 51.
EIS Diamond Drilling, Kirgella Gift and Providence gold deposits
During the quarter, KalGold published the results of its first diamond drill program at Kirgella Gift and
Providence The program comprised four holes totalling 1,070m and was co-funded under the Western
Australian Government's Exploration Incentive Scheme (EIS). The program provided critical structural,
geotechnical and density data to support future resource upgrades.
Page 3
QuarterlyOperationsReport,March2026
Figure 2 – Plan view image of diamond drill hole traces at Kirgella Gift and Providence showing RC drill collars and their gold
content. Dashed pale red polygons depict projected gold zones to surface. Various structures are shown between and
offsetting magnetic ridges (background imagery). Projection: MGA 94 Zone 51.
Page 4
QuarterlyOperationsReport,March2026
Results confirmed significant steeply west-dipping, shear-hosted gold mineralisation within altered
ultramafic units. Highlights include:
• 28m at 2.24 g/t Au from 92m (KGDD25004), including 8.5m at 3.21 g/t and 9m at 2.82 g/t Au,
extending mineralisation into previously untested areas.
• 15m at 1.75 g/t Au from 26m (KGDD25001), including 6m at 2.74 g/t Au — confirming near-surface
continuity and higher-grade internal shoots consistent with the existing resource model
• Multiple intercepts at Providence confirming primary mineralisation: 3m at 2.14 g/t Au from 83m
and 1m at 2.12 g/t Au from 138m
Figure 3 – Drill hole KGDD25004, 111.3-119.4 m (trays 30&31), showing strong gold mineralisation at Kirgella Gift. Note the
highest grades are associated with broken core containing strong shearing and quartz-carbonate veining (well shown from
113 to 115 m) within a brecciated zone. This is typical of the appearance of mineralised rock at Kirgella Gift.
Two deeper holes have collectively confirmed mineralisation to approximately 300 m vertical depth, around
160 m below the current Kirgella Gift resource envelope. This represents a significant step-change in the
understanding of the deposit's depth potential and has prompted the upcoming drill program to test to
depth beneath the footprint of the resource.
A previously unrecognised set of north–south trending, east-dipping fault structures has been identified
from core logging. These structures explain observed local offsets in mineralisation and will directly
influence targeting of displaced gold mineralised lodes in upcoming programs. Magnetic data interpretation
Page 5
QuarterlyOperationsReport,March2026
further suggests that priority cross-cutting structures dip more steeply than previously modelled, pushing
the highest-priority deeper targets further to the west.
The EIS diamond drilling has significantly reinforced KalGold's confidence in the vertical continuity and
depth potential of the primary gold system at Kirgella Gift, with follow-up drilling to commence as soon as
possible (see below).
Generation of new drill programs at Pinjin
Results from recent RC and diamond drill programs Kirgella Gift, Providence, and Lighthorse, as well as
geophysical survey results from the area, provided an enormous amount of data to be digested and
integrated into our knowledge base. In-depth interrogation of these datasets and application of the findings
to the Pinjin Project area have resulted in significant target refinement and expansion.
Results of these programs show that primary gold mineralisation in fresh rock extends along a strike
length of more than 1,100 m, closely correlating with near-surface gold anomalism and mineralisation
along 1,600 m of strike, and open to the north.
Three fully-funded, efficient, cost-effective RC, diamond and aircore drill programs comprising
over 19,000 m of drilling have been generated to further our aim to discover a sizeable gold deposit at
Pinjin. At the time of writing, RC drilling had commenced, with preparation ongoing for the diamond and
aircore programs. The programs comprise:
• RC drilling at Pinjin comprising 41 holes for a total of 6,850 m. This will comprise:
o Drilling at Kirgella Gift and Providence (22 holes for 3,600 m) to infill the existing JORC
Code (2012) Inferred Mineral Resource Estimate (MRE) of 2.34 Mt @ 1.0 g/t Au for
76,000 oz. Drilling will aim to fill data gaps and extend mineralisation up- and down-dip for
greater certainty regarding gold mineralisation distributions. Additional selective drilling is
targeted to extend gold mineralisation to the north and west, and to test for continuity of
gold mineralisation between the deposits.
o Drilling at Lighthorse (19 holes for 3,250 m) to infill and extend earlier programs to better
define the geometry, continuity, depth potential and lateral extent of the primary gold
system. Gold mineralisation associated with SAM conductivity anomalism will extend the
program to the north to test the full strike extent.
• Deep diamond drilling beneath Kirgella Gift-Providence, comprising 4 holes for 1,800 m. Drill
holes will aim to intercept known mineralised horizons up to 200 m vertically beneath current
deepest known gold mineralisation. Confirmation of deep-seated primary gold mineralisation
would prompt expansion of the MRE.
• Aircore drill testing of the LTZ flexure target, centred ~3.5 km southeast of Kirgella Gift-
Providence, comprising up to 215 first pass drill holes for 10,750 m. Here, a shift in LTZ strike from
NNW-trending in the north to a north–south orientation in the south coincides with numerous
untested structural and demagnetisation targets that have been defined by the Company.
The Company anticipates that the results of these drill programs will provide the necessary data for more
detailed drill programs to move the area towards discovery and further resource definition.
Page 6
QuarterlyOperationsReport,March2026
Figure 4 – Drill programs at the Pinjin Gold Project showing planned RC collar locations (inverted black triangles) at Kirgella
Gift (underway), Providence, and Lighthorse shown over earlier KalGold and historic drilling. The current program is,
expected to be completed in around 6 weeks. Planned diamond drilling at Kirgella Gift and Providence (black circles) are
also shown. In the southeast, the planned collars for full implementation of the LTZ Flexure aircore drill program are shown
(black triangles), though logistical constraints could necessitate a staged execution. Projection: MGA 94 Zone 51.
Page 7
QuarterlyOperationsReport,March2026
OTHER PROJECTS
Reassessment of the La Mascotte gold deposit continued. Though recent analysis is unlikely to result in a
new resource estimate in the short term, they are highlighting target areas for efficient and effective drilling
for future programs that would facilitate expanding and upgrading of the MRE.
Productive discussions with Traditional Owners continue to advance, to enable KAL to accelerate on
ground work progress at Bulong.
During the quarter, a non-core project was sold to another party.
• KalGold’s Zelica gold project was sold to Strata Minerals (ASX: SMX) to complement their
exploration activities around the Zelica gold mine immediately north of KalGold’s former tenure.
Comprising exploration tenement E39/2188, the project contains gold anomalism and prospector
workings along strike from the Zelica gold mine. KalGold’s consideration for the sale was $20,000
cash and $80,000 of SMX stock priced at 2.3c per share, subject to a 6-12 month escrow period.
Other projects continue to be assessed, with new applications submitted around the Pinjin Project area
and in other prospective areas. Several small tenements were granted. Discussions are also ongoing on
other outlying projects. Meanwhile, field programs at other non-core early-stage projects further advanced
these projects through geophysical data interpretation, mapping and surface sampling activities. No
material results were reported.
COMPANY TOTAL GOLD RESOURCE
KalGold’s total JORC Code (2012) Inferred Mineral Resource base remains at 214,300 ounces of gold
(Table 2). KalGold’s low-cost gold resources are either outcropping or located within metres of
surface. At both Pinjin (Kirgella Gift, Providence) and Bulong Taurus (La Mascotte) (Figure 1), overall gold
grades exceed 1.0 g/t Au, with both projects containing zones of higher-grade, near-surface gold
mineralisation that may be amenable to open pit mining.
Table 1 – KalGold Total Mineral Resource statement. Bulong Taurus (La Mascotte) reported at a 0.6 g/t gold cut-
off (7 March 2023), and the Pinjin (Kirgella Gift and Providence) reported at a 0.5 g/t gold cut off (25 July
2024). Totals may not sum due to rounding. The Company confirms that the material assumptions and
technical parameters underpinning the JORC Code (2012) Inferred Mineral Resources Estimates continue to
apply and have not materially changed.
Classification Project Tonnes (Mt) Au Grade (g/t) Au (oz)
Discovery Cost
per ounce
Inferred
Bulong Taurus 3.61 1.2 137,900 A$4.79
Pinjin 2.34 1.0 76,400 A$4.18
Total 5.95 1.1 214,300 $4.57
CORPORATE
Finance and Use of Funds
The Company’s balance sheet remains strong with $2.9 million in cash and no debt at 31 March 2026.
Invoices for drilling costs incurred in the previous quarter were paid during this quarter.
Expenditure incurred on exploration activities during the quarter amounted to approximately $808,000.
Page 8
QuarterlyOperationsReport,March2026
No expenditure was incurred on mining production or development activities.
Payments totalling approximately $123,000 were made to related parties, as reported in the attached
Appendix 5B comprising directors’ fees and salary.
Authorised for lodgement by the Board of Kalgoorlie Gold Mining Limited.
For further information regarding KalGold, please visit kalgoldmining.com.au or contact:
Matt Painter
Managing Director and Chief Executive Officer
Tel +61 8 6002 2700
Page 9
QuarterlyOperationsReport,March2026
1
See KalGold ASX release, “First Kirgella Gift Inferred Resource of 76,400oz from 3m”. 25 July 2024.
2
See KalGold ASX release, “La Mascotte gold deposit: First JORC (2012) Mineral Resource of 138,000 oz Au”. 7 March 2023.
About KalGold
ASX-listed resources company Kalgoorlie Gold Mining (KalGold, ASX: KAL) is a proven, low-cost
gold discoverer with a large portfolio of West Australian projects and a total gold resource in excess
of 214,000 oz. KalGold prides itself on defining shallow, potentially open-pittable gold resources at
very low costs, currently less than A$4.60 per ounce of gold2
. Current focus includes:
• The Pinjin Project within the 30Moz Laverton Tectonic Zone (host to
Sunrise Dam, Granny Smith, Rebecca, Anglo Saxon, and Wallaby
projects) is located only 25 km north along strike from Ramelius
Resources (ASX: RMS) Rebecca Gold Project. A first
JORC Code (2012) Inferred Mineral Resource at Kirgella Gift
and Providence (2.34 Mt @ 1.0 g/t Au for 76,400 oz1
)
represents the first area targeted by the Company, with
many more targets scheduled for testing. The company
aims to define further resources as these targets are
tested. Some tenure is the subject of a farm-in over two
years. Between this tenure and KalGold’s own tenure and
applications, the Company has established a significant
presence in a strategic and important gold producing region.
• The Bulong Taurus Project, 35 km east of Kalgoorlie-
Boulder. Contains the outcropping La Mascotte gold
deposit where KalGold has defined a JORC Code (2012) Inferred Mineral Resource
of 3.61 Mt @ 1.19 g/t Au for 137,900 oz2
, plus a series of satellite prospects and
historic workings of the Taurus Goldfield. Work continues at the project
Follow KalGold on social media
Page 10
QuarterlyOperationsReport,March2026
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements and forward-looking information within the meaning of applicable
Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.
This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to
management’s expectations with respect to, among other things, the timing and amount of funding required to execute the
Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any
changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits,
certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s
properties, environmental risks, the availability and mobility of labour, the focus of the Company in the future, demand and market
outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise
funding privately or on a public market in the future, the Company’s future growth, results of operations, restrictions caused by
COVID-19, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”,
“expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking
information is based on the opinions and estimates of management at the date the information is given, and on information
available to management at such time.
Forward-looking information involves significant risks, uncertainties, assumptions, and other factors that could cause actual results,
performance, or achievements to differ materially from the results discussed or implied in the forward-looking information. These
factors, including, but not limited to, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company
to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls,
regulations, political or economic developments in Australia or other countries in which the Company does business or may carry
on business in the future, operational or technical difficulties in connection with exploration or development activities, employee
relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing
quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent
risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and
other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and
flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and
should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could
cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf
of, the Company. Prospective investors should not place undue reliance on any forward-looking information.
Although the forward-looking information contained in this news release is based upon what management believes, or believed
at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be
consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated,
estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness
of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any
such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except
as may be required by law.
No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved
the information contained in this news release.
COMPETENT PERSON STATEMENT
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Dr Matthew Painter, a Competent Person who is a Member of the Australian Institute of Geoscientists.
Dr Painter is the Managing Director and Chief Executive Officer of Kalgoorlie Gold Mining Limited (KalGold) and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Dr Painter consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears. Dr Painter holds securities in Kalgoorlie Gold Mining Limited.
Page 11
QuarterlyOperationsReport,March2026
EXPLORATION RESULTS
The references in this announcement to Exploration Results were reported in accordance with Listing Rule 5.7 in the
announcements titled:
• KalGold farms-in to Kirgella gold tenement and acquires Rebecca West tenure at Pinjin, 23 May 2023
• Thick, shear-hosted gold mineralisation intercepted at Kirgella Gift, 8 June 2023
• Shallow, high-grade results extend Kirgella Gift and Providence corridor to over 1,150m of strike, 25 October 2023
• Providence: North plunging shallow gold mineralisation has significant potential at depth, 7 December 2023.
• Thick gold intercepts from initial drilling at Wessex near Anglo Saxon Gold Mine, 23 May 2024
• More thick, shallow gold intercepts at Pinjin extend Wessex target to 2km strike length, 9 October 2024.
• First-pass aircore drilling at Kirgella West: broad gold anomalism and mineralisation over 1,200 m strike, 18 December
2024.
• Lighthorse gold discovery, Pinjin, 7 February 2025
• RC drilling confirms primary gold at Lighthorse, 15 April 2025
• Farm-in at Pinjin Gold Project completed, 29 May 2025.
• SAM geophysical survey commencing around Lighthorse, and exploration update, 6 June 2025
• Lighthorse Strike Extended to 1,450m. Extensive RC Program Beginning Shortly, 15 July 2025
• Sub-Audio Magnetics (SAM) geophysical data guides upcoming RC drill program at Pinjin. Diamond Drilling at Kirgella
Gift and Providence to commence soon, 26 August 2025.
• New RC drilling extends primary gold at Lighthorse, 19 December 2025
• Kirgella Gift diamond drilling intersects thick gold mineralisation, confirms primary gold extends at depth, 13 February
2026.
• Multiple drill programs at Kirgella Gift and Lighthorse, to commence mid-April, 11 March 2026
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
previous market announcements noted above.
MINERAL RESOURCE ESTIMATES
The references in this announcement to Mineral Resource estimates were reported in accordance with Listing Rule 5.8 in the
following announcements:
• La Mascotte gold deposit: First JORC (2012) Mineral Resource of 138,000 oz Au, 7 March 2023.
• First Kirgella Gift Inferred Resource of 76,400 oz from 3m, 5 July 2024.
In accordance with ASX Listing Rule 5.23, the Company confirms that it is not aware of any new information or data that materially
affects the information included in the previous market announcement noted above and that all material assumptions and technical
parameters underpinning the Mineral Resource estimates in the previous market announcements continue to apply.
ASX Listing Rules Appendix 5B (17/07/20) Page 12
+ See chapter 19 of the ASX Listing Rules for defined terms.
QuarterlyCashflowReport,March2025
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
KALGOORLIE GOLD MINING LIMITED
ABN Quarter ended (“current quarter”)
80 645 666 164 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs (21) (103)
(e) administration and corporate costs (221) (819)
1.3 Dividends received (see note 3)
1.4 Interest received 47 54
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other (provide details if material)
1.9 Net cash from / (used in) operating activities (195) (868)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements (62)
(c) property, plant and equipment (104) (116)
(d) exploration & evaluation (808) (2,333)
(e) investments
(f) other non-current assets
2.2 Proceeds from the disposal of:
ASX Listing Rules Appendix 5B (17/07/20) Page 13
+ See chapter 19 of the ASX Listing Rules for defined terms.
QuarterlyCashflowReport,March2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
(a) entities
(b) tenements 20 60
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (EIS Rebate) 104
2.6 Net cash from / (used in) investing activities (892) (2,347)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options 2 2,352
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(18)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (capital raising fees)
3.10 Net cash from / (used in) financing activities 2 2,334
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
3,982 3,778
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(195) (868)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(892) (2,347)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
2 2,334
4.5 Effect of movement in exchange rates on cash
held
- -
4.6 Cash and cash equivalents at end of period 2,897 2,897
ASX Listing Rules Appendix 5B (17/07/20) Page 14
+ See chapter 19 of the ASX Listing Rules for defined terms.
QuarterlyCashflowReport,March2025
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 222 244
5.2 Call deposits 2,675 3,738
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
2,897 3,982
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their associates
included in item 1
32
6.2 Aggregate amount of payments to related parties and their associates
included in item 2
91
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for,
such payments.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the sources
of finance available to the entity.
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (please specify)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have been
entered into or are proposed to be entered into after quarter end, include a note providing details of
those facilities as well.
ASX Listing Rules Appendix 5B (17/07/20) Page 15
+ See chapter 19 of the ASX Listing Rules for defined terms.
QuarterlyCashflowReport,March2025
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (195)
8.2 (Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(808)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,003
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,897
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 2,897
8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3) 2.89
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise,
a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating cash
flows for the time being and, if not, why not?
Answer: N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to
fund its operations and, if so, what are those steps and how likely does it believe that they will
be successful?
Answer: N/A
8.8.3 Does the entit