EIS diamond drilling results, Pinjin
Released
Released
Announcement PDF
ASX Announcement & Media Release | ASX: KAL | 13 February 2026
Kirgella Gift diamond drilling intersects
thick gold mineralisation, confirms
primary gold extends at depth
KalgoorlieGoldMiningLimited | ACN645666164
Suite 2, 1209 Hay St, West Perth WA 6005, Australia
T: +61 (0)8 6002 2700 | E: info@kalgoldmining.com.au | www.kalgoldmining.com.au
Kalgoorlie Gold Mining (ASX: KAL) (‘KalGold’ or ‘the Company’) is pleased to report thick gold intercepts
and orogenic gold mineralisation below previous RC drilling at Kirgella Gift and Providence gold deposits.
The mineralised system remains open at depth, beneath the 76,000 oz JORC Code (2012) Inferred Mineral
Resource Estimate (MRE) of 2.34 Mt @ 1.0 g/t Au (ASX: KAL 25/07/24).
Highlights:
• First pass diamond drilling program (four diamond holes for 1,154.6 m) completed at Kirgella
Gift and Providence and co-funded under the Western Australian Government’s Exploration
Incentive Scheme (EIS).
• Broad zones of gold anomalism and mineralisation are directly associated with extensive
shearing, alteration, and veining. Thick gold intercepts include:
o KGDD25004: 15 m at 1.75 g/t Au from 26 m, including 6 m at 2.74 g/t Au from 28 m
and 1 m at 3.09 g/t Au from 38 m
and 4 m at 2.72 g/t Au from 50 m, including 2 m at 4.59 g/t Au from 51 m
and 28 m at 2.24 g/t Au from 92 m, including 8.5 m at 3.21 g/t Au from 96 m
and 9 m at 2.82 g/t Au from 110 m
o KGDD25003: 4 m at 1.64 g/t Au from 82 m, including 3 m at 2.14 g/t Au from 83 m
and broad anomalism of 17 m at 0.29 g/t Au from 32 m (at 0.1g/t cutoff)
• Primary orogenic gold mineralisation continues to a vertical depth of 300 m beneath surface,
deeper than previous RC drilling, extending 160 m below the JORC Code (2012) Inferred MRE.
o KGDD25001: 10 m at 1.03 g/t Au from 231 m, including 1 m at 2.83 g/t Au from 233 m
and 1 m at 2.14 g/t Au from 237 m
o KGDD25002: 2 m at 0.91 g/t Au from 259 m and 6 m at 0.94 g/t Au from 268 m
within broad anomalism of 21 m at 0.51 g/t Au from 255 m (at 0.1g/t cutoff)
and 1 m at 1.18 g/t Au from 350 m
• Deep intercepts are located at the southern margin of Kirgella Gift. New targets at depth will
be tested for vertical continuity and repetition directly beneath the deposit.
• Drill core observations and measurements confirm shear-hosted gold mineralisation dips steeply
west (to subvertical). Later north-south striking, east-dipping faults identified, which will facilitate
defining and tracking offsets on gold mineralisation.
o Targeted cross-cutting structures evident in magnetic datasets dip steeper than
interpreted, shifting the intersection drill target further westward beyond existing drilling.
o Comprehensive structural, geotechnical, and density dataset collected from diamond core
expected to support future JORC Code (2012) MRE updates.
• Planning is underway for drilling to test new targets at Kirgella Gift and Providence.
Page 2
EISdiamonddrilling results, Pinjin
Commenting on the results, KalGold Managing Director Matt Painter said:
“We are extremely pleased with the results of our first pass diamond drilling program which
delivered key structural, geotechnical, and density data to support future resource upgrades.
Importantly, we have intersected thick gold mineralisation in previously untested areas. Intercepts
at depth hint at the potential for vertical extension of the orogenic gold mineralised system at
Kirgella Gift-Providence, beneath known resources.
We have already identified new targets directly below the near-surface 76,000 oz Inferred JORC
Code (2012) Mineral Resource Estimate that warrant follow up drill testing. We look forward to
updating shareholders as this work continues.
Advancing gold exploration and resource definition to depth at Kirgella Gift and Providence will
complement KalGold’s exploration field programs defining the extent of gold mineralisation at
Lighthorse and testing additional new targets across the broader Pinjin Project area.”
Results of the program
A total of 4 diamond drill holes were completed for 1,154.6 m at the Kirgella Gift and Providence gold
deposits between 10 October and 1 November 2025. This first diamond drill program undertaken by
KalGold at Pinjin was co-funded by the WA state government’s EIS.
Table 1 – Selected drill hole intercepts from KalGold’s first diamond drill program at Kirgella Gift and Providence.
Enveloping zone gold anomalism is calculated at >0.1 g/t Au cut-off with 2 m maximum internal waste. Intercepts
calculated at >0.5 g/t gold cut-off (“Including” intercept >2.0 g/t Au cut-off) with 2 m maximum internal waste. See
Appendix 2 for a full listing of all intercepts, and Appendix 3 for individual sample assays used to define these.
Drill hole Intercepts Enveloping mineralised zone
Kirgella Gift
KGDD25004 15 m at 1.75 g/t Au from 26 m 23 m at 1.28 g/t Au from 20 m
including 6 m at 2.74 g/t Au from 28 m
and 1 m at 3.09 g/t Au from 38 m
4 m at 2.72 g/t Au from 50 m 6 m at 1.87 g/t Au from 49 m
including 2 m at 4.59 g/t Au from 51 m
28 m at 2.24 g/t Au from 92 m 29 m at 2.18 g/t Au from 91 m
including 8.5 m at 3.21 g/t Au from 96 m
and 9 m at 2.82 g/t Au from 110 m
KGDD25001 10 m at 1.03 g/t Au from 231 m 11 m at 0.97 g/t Au from 230 m
including 1m at 2.83 g/t Au from 233 m
and 1m at 2.14 g/t Au from 237 m
KGDD25002 2 m at 0.91 g/t Au from 259 m 21 m at 0.51 g/t Au from 255 m
6 m at 0.94 g/t Au from 268 m
1 m at 1.14 g/t Au from 336 m 3 m at 0.51 g/t Au from 336 m
1 m at 1.18 g/t Au from 350 m 2 m at 0.78 g/t Au from 349 m
Providence
KGDD25003 4.5 m at 0.53 g/t Au from 40 m 17 m at 0.29 g/t Au from 32 m
3 m at 2.14 g/t Au from 83 m 4 m at 1.64 g/t Au from 82 m
1 m at 1.88 g/t Au from 105 m
1 m at 1.12 g/t Au from 132 m
1 m at 2.12 g/t Au from 138 m 8.9 m at 0.39 g/t Au from 138 m
Page 3
EISdiamonddrilling results, Pinjin
Figure 1 – Plan view image of diamond drill hole traces at Kirgella Gift and Providence showing RC drill collars and their gold
content. See Table 1 and appendices for details on intercepts quoted. Dashed pale red polygons depict projected gold
zones to surface. Various structures are shown between and offsetting magnetic ridges (background imagery). Projection:
MGA 94 Zone 51.
Page 4
EISdiamonddrilling results, Pinjin
Gold mineralisation controls at Kirgella Gift and Providence
Shear-hosted, steeply west dipping gold mineralisation is hosted within a variably talc-carbonate-chlorite
altered ultramafic unit at Kirgella Gift and Providence. Mineralisation has been defined over a north-south
strike length of 700 m by previous RC drilling, with a current gap in modelled mineralisation of some 135 m.
All four diamond drill holes intercepted thick gold mineralisation and anomalism, with holes KGDD25001
and KGDD25002 directly targeting and intersecting gold mineralisation at depth (Table 1). Downhole
intersections of up to 28 m (or ~15 m true thickness) were returned in KGDD25004 (Figure 2).
Figure 2 – Drill hole KGDD25004, 111.3-119.4 m (trays 30&31), showing strong gold mineralisation at Kirgella Gift. Assay
values are incorporated into assay intervals reported in Appendix 2. Note the highest grades are associated with broken
core containing strong shearing and quartz-carbonate veining (well shown from 113 to 115 m) within a brecciated zone.
This is typical of the appearance of mineralised rock at Kirgella Gift.
Mineralised zones commonly correlate well between adjacent drill holes (Figure 3 &Figure 4). Where
continuity is less clear, this is interpreted to reflect later east-dipping and north-striking offsetting faulting
(first identified in this program), or anastomosing/gradual lateral deviation of the mineralised shear zone.
The sheared ultramafic host sequence is not uniformly mineralised throughout. Instead, gold mineralisation
is confined to shear-bounded breccia zones, locally up to tens of metres thick, that comprise abundant
fragments of dynamically broken and dismembered quartz-carbonate veins, minor pyrite and localised
Page 5
EISdiamonddrilling results, Pinjin
alteration bleaching. These structures are consistently steeply west-dipping, with dips varying between
vertical to approximately 70°. Aside from this textural distinction, the middle- to upper-greenschist
metamorphic grade makes gold mineralisation difficult or impossible to distinguish visually.
Figure 3 – Cross section 6659675mN (looking north), showing gold mineralisation intersected in KGDD25004 at Kirgella Gift.
New drill intercepts correlate well with earlier RC drill holes, defining steeping west-dipping mineralised bodies that are
consistent with observations in drill core. New intercepts (white labels) will be incorporated into future MRE updates. Results
from pre-KalGold historic programs also shown (grey labels, see ASX: KAL 24/5/2023). Projection: MGA 94 Zone 51.
Primary gold mineralisation has been intercepted at depths approaching 300 m vertically below surface
on the southern margin of Kirgella Gift. Although KGDD25001 and KGDD25002 lie peripheral to the
Page 6
EISdiamonddrilling results, Pinjin
currently modelled deposit footprint and return thinner, more widely spaced intercepts, both holes
demonstrate that the mineralised system extends well below previously tested depths. Targeted drilling
directly beneath the higher-grade core of the Kirgella Gift deposit will be prioritised to assess whether thick,
high-grade mineralisation persists at depth.
Figure 4 – Cross section 6659530mN (looking north), showing gold mineralisation intercepts in KGDD25001 (white label) at
the southern edge of Kirgella Gift (KGDD25002, collared 80 m further south returned deeper gold intercepts, approaching
300 m beneath surface). New drill intercepts again correlate well with earlier RC drilling, showing continuity and comparable
grade. Additional deeper drilling beneath the centre of Kirgella Gift (and Providence) is required to test for zones of higher
grade, thickness and vertical continuity. Results from earlier KalGold and pre-KalGold historic programs also shown (grey
labels, see ASX: KAL 25/10/2023 & 24/5/2023). Projection: MGA 94 Zone 51.
Page 7
EISdiamonddrilling results, Pinjin
Details of the drill program
The EIS co-funded program aimed to advance our understanding of the Kirgella Gift-Providence gold
deposit. Specific aims included:
• The observation and characterisation of gold mineralisation at both Kirgella Gift and Providence.
• Confirmation of lithological units, including multi-element geochemical characterisation.
• Testing inferred high grade plunge corridors, and a potential intersection window at depth well
below existing RC drill coverage between the two deposits.
• Testing two major deposit scale structures evident in aeromagnetic imagery that were interpreted
to influence high grade mineralisation, and plunge direction.
Existing RC drill hole intercept grade and distribution suggested higher grade mineralisation plunges
moderately to the south at Kirgella Gift, with an opposing moderate northward plunge to mineralisation at
Providence. In combination with the above observations, structural analysis of pre-existing high resolution
aeromagnetic datasets indicates two potentially significant, deposit scale faults or shears (Figure 1) exert
control on gold mineralisation:
• Kirgella Gift: NE-SW (040°) striking, moderately SE dipping fault surface.
• Providence: NNW-SSE (345°) striking, moderately E dipping fault surface.
Extrapolating defined high grade plunge corridors and inferred fault planes revealed a potentially
mineralised intersection zone approximately 250 m vertically below surface, and off the southern end of
the Kirgella Gift deposit in plan view (tested with holes KGDD25001 and KGDD25002). Additionally, the
program included two shorter drill holes directly within and adjacent to areas of known gold mineralisation
at both Kirgella Gift (KGDD25004) and Providence (KGDD25003).
All holes within the program were angled to the west (270°) to intersect conceptual easterly dipping
structural features at a high angle.
Offsetting faults
We identified a previously unrecognised generation of faults that can offset gold mineralisation These
faults strike north–south, subparallel to the main shear zone, and dip moderately to the east similar to
those described above. In section these faults crosscut the main shear foliation and gold mineralisation.
The faults exhibit normal displacement (east down, west up), so recognition and ongoing characterisation
of these structures will assist in following faulted or offset lodes and mineralised intervals during future
drilling.
Westward shift of the intersection target
The NW and NE-striking, moderately east-dipping structures targeted in this program were not intersected.
However, magnetic datasets clearly show these oblique structures are present (e.g. Figure 1). This
suggests they may dip more steeply to the east, be sub-vertical, or potentially steeply west-dipping. As a
result, the targeted intersection zone was not effectively tested and remains open to the west of the current
drill coverage. This area represents a priority target for future drilling.
Collection of data for future resource upgrades
Structural, geotechnical, and density datasets have been collated for the first time at Kirgella Gift and
Providence. These datasets, which can only be collected from diamond drill core (as opposed to RC
samples) are critical inputs for future JORC Code (2012) compliant MRE upgrades and potential Ore
Reserve estimates.
Page 8
EISdiamonddrilling results, Pinjin
Future drill programs
Upcoming drill programs were previously outlined following the release of RC drill results from Lighthorse
in December (ASX: KAL 19/12/25) and include:
• Further RC drilling at Lighthorse, comprising selective infill and extensional drilling, including along
strike to the north beyond the present limit of RC drilling.
• Extensive first-pass aircore drilling to test new conceptual gold targets throughout the Pinjin Project
area, with a focus on targets east of Kirgella Gift and Lighthorse and along strike from Ramelius
Resources’ (ASX: RMS) Rebecca deposit of the Rebecca-Roe Gold Project.
The results of this program also require further drilling at and around Kirgella Gift and Providence to test
the vertical continuity and/or repetition of high-grade gold mineralisation. The deposits will also require
studies to facilitate advancement towards higher-certainty resources and reserves which are likely to
include metallurgical, geotechnical, and mining studies. The Company will provide further updates as
program details are finalised and implemented.
Authorised for lodgement by the Board of Kalgoorlie Gold Mining Limited.
For further information regarding KalGold, please visit www.kalgoldmining.com.au or contact:
Matt Painter
Managing Director and Chief Executive Officer
Tel +61 8 6002 2700
Follow KalGold on social media.
Page 9
EISdiamonddrilling results, Pinjin
About the Pinjin Project
The Pinjin Gold Project is located in a Tier One location approximately 140 km northeast of Kalgoorlie-
Boulder and covers a substantial portion of the southern part of the prolific Laverton Tectonic Zone (LTZ).
To the north, this major crustal structure hosts some of the Eastern Goldfields’ largest gold mines and
deposits.
The project is strategically located next door to Ramelius Resources (ASX: RMS) Rebecca Gold Project,
where a recent definitive feasibility study outlined commencement of mining activities in the December
2027 quarter (ASX: RMS 28/10/25).
Figure 4 – Location map of the Kirgella Gift and Providence gold deposits at KalGold’s Pinjin Project around 140 km northeast
of Kalgoorlie-Boulder. The project is situated approximately 25 km north of Ramelius Resources’ (ASX: RMS) Rebecca
Gold Project. Projection: MGA 94 Zone 51.
Page 10
EISdiamonddrilling results, Pinjin
About KalGold
ASX-listed resources company Kalgoorlie Gold Mining (KalGold, ASX: KAL) is a proven, low-cost gold
discoverer with a large portfolio of West Australian projects and a total gold resource in excess of
214,000 oz. KalGold prides itself on defining shallow, potentially open-pittable gold resources at very
low costs, currently less than A$4.60 per ounce of gold2
. Current focus includes:
• The Pinjin Project within the 30 Moz Laverton Tectonic Zone (host to
Sunrise Dam, Granny Smith, Rebecca, Anglo Saxon, and Wallaby
projects) is located only 25 km north along strike from Ramelius
Resources (ASX: RMS) Rebecca Gold Project. A first JORC
Code (2012) Inferred Mineral Resource Estimate at Kirgella
Gift and Providence (2.34 Mt at 1.0 g/t Au for 76,400 oz1
)
represents the first area targeted at Pinjin, with many
more targets scheduled for testing. The Company aims
to define further resources as these targets are tested.
The Company has established a significant
presence in a strategic and important gold producing region
with active work programs progressively unlocking the
potential of this underexplored region.
• The Bulong Taurus Project, 35 km east of Kalgoorlie-
Boulder. Contains the outcropping La Mascotte gold deposit
where KalGold has defined a JORC Code (2012) Inferred Mineral Resource Estimate of
3.61 Mt at 1.19 g/t Au for 138,000 oz2
, plus a series of satellite prospects and historic
workings of the Taurus Goldfield. Work continues at the project.
1
See KalGold ASX release, “First Kirgella Gift Inferred Resource of 76,400oz from 3m”. 25 July 2024.
2
See KalGold ASX release, “La Mascotte gold deposit: First JORC (2012) Mineral Resource of 138,000 oz Au”. 7 March 2023.
Page 11
EISdiamonddrilling results, Pinjin
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements and forward-looking information within the meaning of applicable
Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.
This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to
management’s expectations with respect to, among other things, the timing and amount of funding required to execute the
Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any
changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits,
certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s
properties, environmental risks, the availability and mobility of labour, the focus of the Company in the future, demand and market
outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise
funding privately or on a public market in the future, the Company’s future growth, results of operations, restrictions caused by
COVID-19, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”,
“expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking
information is based on the opinions and estimates of management at the date the information is given, and on information
available to management at such time.
Forward-looking information involves significant risks, uncertainties, assumptions, and other factors that could cause actual results,
performance, or achievements to differ materially from the results discussed or implied in the forward-looking information. These
factors, including, but not limited to, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company
to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls,
regulations, political or economic developments in Australia or other countries in which the Company does business or may carry
on business in the future, operational or technical difficulties in connection with exploration or development activities, employee
relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing
quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent
risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and
other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and
flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and
should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could
cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf
of, the Company. Prospective investors should not place undue reliance on any forward-looking information.
Although the forward-looking information contained in this news release is based upon what management believes, or believed
at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be
consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated,
estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness
of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any
such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except
as may be required by law.
No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved
the information contained in this news release.
COMPETENT PERSON STATEMENT
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based
on information compiled by Dr Matthew Painter, a Competent Person who is a Member of the Australian Institute of Geoscientists.
Dr Painter is the Managing Director and Chief Executive Officer of Kalgoorlie Gold Mining Limited (KalGold) and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Dr Painter consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears. Dr Painter holds securities in Kalgoorlie Gold Mining Limited.
Page 12
EISdiamonddrilling results, Pinjin
EXPLORATION RESULTS
The references in this announcement to Exploration Results were reported in accordance with Listing Rule 5.7 in the
announcements titled:
• New RC drilling extends primary gold at Lighthorse, 19 December 2025
• Sub-Audio Magnetics (SAM) geophysical data guides upcoming RC drill program at Pinjin. Diamond Drilling at Kirgella
Gift and Providence to commence soon, 26 August 2025
• Lighthorse Strike Extended to 1,450m. Extensive RC Program Beginning Shortly, 15 July 2025
• SAM geophysical survey commencing around Lighthorse, and exploration update, 6 June 2025
• Farm-in at Pinjin Gold Project completed, 29 May 2025
• Quarterly activities report for the quarter ending 31 March 2025, 30 April 2024
• Lighthorse RC program confirms primary gold mineralisation at depth, follow up drilling imminent, 15 April 2025
• Aircore drilling to test Lighthorse strike extensions in April, 10 March 2025
• Multi-kilometre target areas along strike at KalGold’s Lighthorse discovery, 17 February 2025
• Lighthorse gold discovery follow-up RC drilling to commence first week of March, 13 February 2025
• ‘Lighthorse’ gold discovery at Pinjin: thick, high-grade gold intercepted at new greenfields find, 7 February 2025
• First-pass aircore drilling at Kirgella West: broad gold anomalism and mineralisation over 1,200m strike, 18 December
2024
• Quarterly activities report for the quarter ending 30 September 2024, 30 October 2024
• More thick, shallow gold intercepts at Pinjin extend Wessex target to 2 km strike length, 9 October 2024
• Thick gold intercepts from initial drilling at Wessex near Anglo Saxon gold mine, 23 May 2024
• Providence: North plunging shallow gold mineralisation has significant potential, 7 December 2023
• Shallow, high-grade results extend Kirgella Gift and Providence corridor to over 1,150m of strike, 25 October 2023
• Thick, shear-hosted gold mineralisation intercepted at Kirgella Gift, 8 June 2023
• KalGold farms-in to Kirgella gold tenements and acquires Rebecca West tenure at Pinjin, 23 May 2023
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
previous market announcements noted above.
MINERAL RESOURCE ESTIMATES
The references in this announcement to Mineral Resource estimates were reported in accordance with Listing Rule 5.8 in the
following announcements:
• La Mascotte gold deposit: First JORC (2012) Mineral Resource of 138,000 oz Au, 7 March 2023.
• First Kirgella Gift Inferred Resource of 76,400 oz from 3m, 25 July 2024.
In accordance with ASX Listing Rule 5.23, the Company confirms that it is not aware of any new information or data that materially
affects the information included in the previous market announcement noted above and that all material assumptions and technical
parameters underpinning the Mineral Resource estimates in the previous market announcements continue to apply
.
Page 13
EISdiamonddrilling results, Pinjin
APPENDIX 1 – Collar Location Data
Collar location data for diamond drill holes completed within the current program.
Prospect Drill hole Type Tenement Grid
Easting Northing RL Depth Dip Azimuth
(mE) (mN) (mASL) (m) (°) (°)
Kirgella Gift KGDD25001 DD E28/02655 MGA94_51 475,949.6 6,659,529.8 368.4 340 -55 270
KGDD25002 DD E28/02655 MGA94_51 475,946.5 6,659,447.5 367.2 450 -60 270
KGDD25004 DD E28/02655 MGA94_51 475,850.7 6,659,674.6 367.3 189.60 -65 270
Providence KGDD25003 DD E28/02655 MGA94_51 475,879.9 6,659,201.4 363.1 175 -50 270
APPENDIX 2 – Drill Hole Intercepts
Drilling Reporting Parameters
Parameter
Gold mineralisation
intercepts
Sub-grade and low grade
gold mineralisation
Minimum cut-off 0.5 g/t 2.0 g/t 0.1 g/t
Minimum intercept thickness 1m* 1m* 1m
Maximum internal waste thickness 2m* 2m* 2m
KalGold uses automated intercept calculation to ensure unbiased and impartial definition of gold
mineralisation distribution. Gold intercepts are calculated using an algorithm that uses a 0.5 g/t Au cut-off
on a minimum intercept of 1 m and a maximum internal waste of 2 m. Secondary intercepts (i.e., the
“including” intercepts) are defined using a 2.0 g/t cut-off and the same intercept and internal waste
characteristics.
Additionally, broad zones of sub-grade and low grade gold mineralisation are calculated using an algorithm
that uses a 0.1 g/t Au cut-off on a minimum intercept of 1 m, and maximum internal waste interval of 2 m.
Diamond drilling gold intercepts
Prospect Drillhole
Gold intercept Gold intercept
(0.5 g/t cutoff) (2.0 g/t cutoff)
Kirgella Gift KGDD25001 1m @ 0.82 g/t Au from 157m
1m @ 0.61 g/t Au from 162m
1m @ 0.56 g/t Au from 167m
1m @ 0.71 g/t Au from 225m
10m @ 1.03 g/t Au from 231m including 1m @ 2.83 g/t Au from 233m
and 1m @ 2.14 g/t Au from 237m
KGDD25002 2m @ 0.91 g/t Au from 259m
1m @ 0.56 g/t Au from 264m
6m @ 0.94 g/t Au from 268m
1m @ 1.14 g/t Au from 336m
1m @ 1.18 g/t Au from 350m
KGDD25004 3m @ 0.58 g/t Au from 20m
15m @ 1.75 g/t Au from 26m including 6m @ 2.74 g/t Au from 28m
and 1m @ 3.09 g/t Au from 38m
4m @ 2.72 g/t Au from 50m including 2m @ 4.59 g/t Au from 51m
28m @ 2.24 g/t Au from 92m including 8.5m @ 3.21 g/t Au from 96m
and 9m @ 2.82 g/t Au from 110m
2m @ 0.72 g/t Au from 124m
Page 14
EISdiamonddrilling results, Pinjin
Prospect Drillhole
Gold intercept Gold intercept
(0.5 g/t cutoff) (2.0 g/t cutoff)
Providence KGDD25003 4.5m @ 0.53 g/t Au from 40m
3m @ 2.14 g/t Au from 83m including 3m @ 2.14 g/t Au from 83m
2m @ 0.60 g/t Au from 90m
1m @ 0.53 g/t Au from 96m
1m @ 1.88 g/t Au from 105m
1m @ 1.12 g/t Au from 132m
1m @ 2.12 g/t Au from 138m including 1m @ 2.12 g/t Au from 138m
Sub-grade and low grade gold intercepts
Prospect Drillhole
Gold Anomalism
(0.1 g/t cutoff)
Kirgella Gift KGDD25001 1m @ 0.82 g/t Au from 157m
2m @ 0.44 g/t Au from 161m
10m @ 0.22 g/t Au from 167m
5m @ 0.34 g/t Au from 221m
11m @ 0.97 g/t Au from 230m
2m @ 0.14 g/t Au from 305m
KGDD25002 21m @ 0.51 g/t Au from 255m
1m @ 0.22 g/t Au from 287m
3m @ 0.51 g/t Au from 336m
2m @ 0.78 g/t Au from 349m
1m @ 0.23 g/t Au from 360m
KGDD25004 23m @ 1.28 g/t Au from 20m
6m @ 1.87 g/t Au from 49m
29m @ 2.18 g/t Au from 91m
3m @ 0.51 g/t Au from 123m
1m @ 0.10 g/t Au from 184m
Providence KGDD25003 17m @ 0.29 g/t Au from 32m
1m @ 0.10 g/t Au from 57m
4m @ 1.64 g/t Au from 82m
7m @ 0.36 g/t Au from 90m
2m @ 1.00 g/t Au from 104m
8.9m @ 0.39 g/t Au from 138m
1m @ 0.20 g/t Au from 150m
Page 15
EISdiamonddrilling results, Pinjin
APPENDIX 3 – Assay Results
All assays >0.10g/t Au and their adjacent samples (up to 5 samples above and below) are reported below.
Assay results below 0.10 g/t Au (gold anomalism) are shown in grey. Mineralised results are highlighted
as per their usage in defining intercepts (Appendix 2): results over 0.5 g/t Au are bolded, and results over
2.0 g/t Au are bolded and highlighted. Abbreviations used: Au – gold, b.d. – below detection
Hole_ID mFrom mTo Interval Sam
Share your feedback
Discover