Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Quarterly Report & Media Release | ASX: KAL | 31 July 2023
QUARTERLY ACTIVITIES REPORT
for the quarter ended 30 June 2023
Kalgoorlie Gold Mining Limited (ASX: KAL) (‘KAL’ or the ‘Company’) is pleased to provide the following
report on its activities during the June 2023 quarter. The Company’s primary activities during the reporting
period were the farm-in at the Kirgella and Pinjin South gold tenements, the Rebecca West acquisition,
and the continuation of exploration activities across its portfolio of projects across gold and lithium.
Highlights:
Pinjin consolidation includes Kirgella, Pinjin South, Rebecca West (140 km ENE of Kalgoorlie)
•
•
•
•
•
Significantly expanded footprint with farm-in agreement to acquire 75% interest in tenure.
Pinjin Project now covers over 280km2 within the 30Moz Laverton Tectonic Zone.
Kirgella Gift target shows shallow, high-grade mineralisation open along strike.
Highly promising first drill program with a thick (over 35m), gold-mineralised shear zone intersected
by confirmatory RC drilling (3 holes for 355m) with all holes returning significant intercepts.
Numerous targets identified by extensive geophysical reinterpretation and targeting program.
Zelica (175 km NNE of Kalgoorlie – ASX release, 22 June 2023)
•
•
Reconnaissance at Zelica (Eucalyptus Goldfield, on the Celia Tectonic Zone) identified a goldmineralised corridor extending the full length of KalGold’s E39/2188 tenement, comprising:
o 6.8 km total strike length, commencing 600 m south of the off-tenure Zelica gold mine;
o High-grade gold mineralisation in quartz veining including 39.60 g/t Au (KAL012563) and
6.44 g/t Au (KAL012567) within shallow excavations at West Nest;
o Gold mineralisation at Eucalyptus Bore between 0.08 g/t Au and 1.08 g/t Au; and
o Excised prospector workings at Murphy Well 2 and 3.
Systematic first-pass exploration (mapping, possible auger sampling) to commence Q4 2023.
Events post end of reporting period (ASX release, 6 July 2023)
•
•
•
Bulong Taurus: New Mining Lease Application (M25/377) submitted which complements and
abuts the existing M25/19 lease over KalGold’s outcropping La Mascotte deposit.
Pianto: Rock chip samples highlight high lithium prospectivity, prompting advance to next low-cost
stage of exploration.
Perrinvale: Rock chip samples up to 4.08 g/t Au, confirming primary orogenic gold mineralisation.
Corporate
•
Strong balance sheet with over A$2.65 million in cash and no debt as at 31 July 2023 following a
successful $1.4 million placement and $730,000 SPP and the transfer of funds for the Pinjin
acquisition and farm-in.
Kalgoorlie Gold Mining Limited | ACN 645 666 164
Suite 2, 1209 Hay St, West Perth WA 6005, Australia
T: +61 (0)8 6002 2700 | E: info@kalgoldmining.com.au | www.kalgoldmining.com.au
Quarterly Operations Report, June 2023
Commenting on recent activities, KalGold Managing Director and CEO Matt Painter said:
“It was an exciting quarter for KalGold, in which we consolidated our already strong presence in
the Eastern Goldfields. The Kirgella and Pinjin South farm-in, plus the Rebecca West acquisition
are significant opportunities for discovery in one of the most prolific gold-mineralised structures in
the entire Eastern Goldfields.
The initial results from first pass drilling at Kirgella Gift highlight this prospect’s potential and
KalGold is focused on determining the full extent of gold mineralisation. From only 40m beneath
surface, gold mineralisation is wide open to the south, with additional mineralisation evident
several hundred metres away at Providence. KalGold aims to commence systematic RC drilling
as soon as practicably possible to start defining gold mineralisation distributions at Kirgella Gift
and Providence.
Meanwhile, the Zelica project also requires further exploration with first-pass surface sampling
assays in excess of a troy ounce of gold per tonne. We are defining future work programs
throughout the project area to follow up on these results.
In addition, KalGold’s successful placement and oversubscribed SPP highlights strong
endorsement from new and existing investors in the potential of KalGold’s portfolio.”
Figure 1 – KalGold’s projects in the Eastern Goldfields of WA, showing current work activities overlayed on regional geology,
showing granite/greenstone distributions and major faults and tectonic zones. Towns, railways, and major roads also shown.
Projection MGA 94 Zone 51.
Page 2
Quarterly Operations Report, June 2023
PINJIN GOLD PROJECT
KalGold’s Pinjin project lies in the southern part of the Laverton Tectonic Zone. This major goldmineralising structure is host to some of the largest gold deposits in the Eastern Goldfields of Western
Australia, including Sunrise Dam, Wallaby, Granny Smith, and, in the south, Ramelius Resources’
developing Rebecca Gold project (Figure 1).
The southern part of the Laverton Tectonic Zone (and the neighbouring Celia Tectonic Zone) where
KalGold has acquired tenure has received less exploration than the north, largely due to poorer
outcropping. This is also likely to be the reason that some of the largest discoveries in recent years, namely
the Rebecca (Ramelius Resources) and Lake Roe (Breaker Resources) Gold projects, are located in this
region.
Having recognised the significant potential of the area to host large-scale gold deposits, KalGold has
focussed on building its position in the area. Last quarter, a number of targets generated by KalGold were
documented at and around the Jungle Dam prospect on E31/1119. The new tenure acquired and farmed
into during the quarter complement the Jungle Dam targets and establish KalGold as a significant player
in the highly prospective southern part of the Laverton Tectonic Zone.
Figure 2 – Oblique perspective view of KalGold’s Pinjin project, to the south of the Pinjin mining centre. The view looks southsouth-east from Hawthorn Resources’ Anglo Saxon open pit (at the southern end of the Pinjin Goldfield) towards Ramelius
Resources’ Rebecca project around 35 km away. The agreements cover several tenements (pink outlines), including Pinjin
South tenure in the foreground, Kirgella in the middle distance, and Rebecca West tenure in the distance. KalGold’s
applications (black) are shown in the foreground and middle distance, with the footprint of the Rebecca project (blue) in the
distance south of Lake Rebecca. New drilling recently completed by KalGold was at the Kirgella Gift prospect. Oblique view of
Google Earth imagery as of May 2023, with DMIRS tenure footprints shown.
Page 3
Quarterly Operations Report, June 2023
Kirgella, Pinjin South & Rebecca West
During the June quarter, the Company entered into a binding option agreement to acquire a 75% interest
in tenure at Kirgella and Pinjin South, at the southern end of the Pinjin goldfield (ASX release,
23 May 2023). In addition, the Company acquired a 100% interest in tenure at Rebecca West (E28/313536). In total, KalGold now holds over 280km2 of tenure in a world-class gold precinct which hosts Ramelius
Resources’ 1.1 Moz Rebecca Gold Project immediately to the south along strike.
Figure 3 – The Pinjin Project, northeast of Kalgoorlie Boulder. The project is located within the prolific
Laverton Tectonic Zone and Celia Tectonic Zone. The new tenure (farm-in and acquisition, pink
colouring) complements KalGold’s granted tenure and applications (black outlines). The new tenements
are strategically located between the Anglo Saxon gold mine (Hawthorn Resources) and Ramelius
Resources’ (ASX: RMS) Rebecca Project (blue). Other neighbours in the area include OzAurum
(shown), E79, FMG, and Northern Star. Projection: MGA 94 Zone 51.
Kirgella Gift is located on E28/2655 around 14 km south of and along strike from Hawthorn Resources’
Anglo Saxon (Trouser Legs) gold mine. Historic drilling at Kirgella Gift (pre-2011) identified shallow, highgrade gold mineralisation. Impressive results include:
Page 4
Quarterly Operations Report, June 2023
Table 1 – Significant historic intercepts from Kirgella Gift prospect. (See KalGold ASX 23 May 2023,
for a full listing of historic results over the project area).
KGRC004
KGRC008
KGRC016
KSR006
KSRC003
KSRC009
KSRC013
33 m at 3.1 g/t Au from 51 m
including 12 m at 4.66 g/t Au from 52 m
and 2 m at 7.01 g/t Au from 73 m
and 1 m at 14.25 g/t Au from 80 m
13 m at 2.78 g/t Au from 73 m
including 6 m at 4.29 g/t Au from 73 m
and 1 m at 3.03 g/t Au from 83 m
8 m at 2.04 g/t Au from 126 m
including 4 m at 2.73 g/t Au from 126 m
32 m at 2.61 g/t Au from 13 m
including 6 m at 2.61 g/t Au from 18 m
and 5 m at 3.75 g/t Au from 27 m
and 7 m at 4.47 g/t Au from 37 m
10 m at 1.57 g/t Au from 28 m
including 1 m at 6.19 g/t Au from 29 m
12 m at 1.15 g/t Au from 24 m
including 2 m at 3.13 g/t Au from 30 m
and 12 m at 1.38 g/t Au from 45 m
including 1 m at 9.78 g/t Au from 53 m
10 m at 1.93 g/t Au from 12 m
including
4 m at 3.29 g/t Au from 16 m
and 9 m at 2.07 g/t Au from 26 m
including
5 m at 2.93 g/t Au from 28 m
Kirgella Gift – confirmatory drilling intersects thick, shear-hosted gold mineralisation
During the quarter, KalGold undertook a short confirmatory drill program comprising three closely spaced,
RC drill holes at the Kirgella Gift prospect for a total of 355m (KalGold ASX Releases 23 May & 8 June
2023). Results were released in June, with thick, near surface, shear-hosted gold mineralisation
intercepted in all drill holes.
Table 2 – New intercepts from KalGold’s recent drilling at the Kirgella Gift prospect.
KGRC23001
12 m at 1.71 g/t Au from 11 m
including 4 m at 2.91 g/t Au from 16 m
and 7 m at 1.50 g/t Au from 26 m
including 2 m at 3.30 g/t Au from 26 m
KGRC23002
35 m at 1.71 g/t Au from 43 m
including 12 m at 2.11 g/t Au from 44 m
and 3 m at 3.15 g/t Au from 67 m
and 1 m at 2.71 g/t Au from 76 m
and 1 m at 5.13 g/t Au from 93 m
KGRC23003
38 m at 1.86 g/t Au from 73 m
including 6 m at 2.85 g/t Au from 77 m
and 11 m at 2.66 g/t Au from 86 m
and 1 m at 4.20 g/t Au from 105 m
and 1 m at 3.35 g/t Au from 109 m
Page 5
Quarterly Operations Report, June 2023
This thick shear zone style of gold mineralisation is a characteristic of several major gold deposits of the
Laverton Tectonic Zone (e.g., Sunrise Dam). Additionally, there are notable footwall intercepts in new and
historic drill results. Grades vary from subeconomic values (<0.5 g/t Au) up to 14.25 g/t Au in KGRC004.
The persistence of the footwall mineralisation requires testing in future programs which may drive some
RC drill holes deeper into the footwall to test for other gold lodes.
Figure 4 – Long section of Kirgella Gift, looking east, showing grade x metre values for all RC and Diamond drilling intercepts,
with their respective thicknesses. It should be noted that, because the gold mineralisation extends over broad thicknesses,
the section is necessarily wide, so drill traces and intercepts may be in or out of the page relative to one another. It is clear,
however, that gold intercepts at Kirgella Gift define a moderately southward plunge to gold mineralisation. The three RC drill
holes recently completed are shown with black traces. Three possible mineralised zones are depicted, though this is only
one possible interpretation. Other possibilities will be assessed by forthcoming drill programs.
Forthcoming drilling
KalGold’s initial confirmatory drilling will be followed up as soon as permitting allows (targeting
commencement prior to end of August) with systematic drill coverage of the down-plunge extension of
Kirgella Gift, and around the historic Providence prospect (Figure 2) to test continuity between Kirgella Gift
and Providence several hundred metres to the south. KalGold has undertaken a complete reinterpretation
of the geology and structure of the entire Pinjin region by amalgamating and reprocessing publicly
available geophysical datasets. As a result, the Company has identified numerous targets throughout its
new tenure as well as on existing granted tenure and applications. Interpretation work is ongoing. The
Company is also closely monitoring the results of its neighbours’ active exploration programs.
Page 6
Quarterly Operations Report, June 2023
ZELICA PROJECT
In June, KalGold released results
of reconnaissance work at the
Zelica Project, near Lake Carey in
the north Eastern Goldfields of
Western Australia (KalGold ASX
Release, 22 June 2023).
Numerous
samples
were
collected during the recent
reconnaissance
campaign.
Samples were collected from
surface
exposures,
shallow
excavations and historic RC drill
chip material along a gold
mineralised corridor extending the
entire north-south length of the
tenement. The corridor extends
from off-tenure at the Zelica gold
mine (600m to the north) and
southward along the length of
E39/2188, covering around 6.8km
within the tenement.
Figure 5 – New gold assays peak at West Nest where high-grade gold was defined
in a quartz vein. *JORC Code (2004) Mineral Resource Estimate, Exterra
Resources Ltd, 23 April 2013 (WAMEX Report A98026); **Murphy Well drilling,
Centenary International Mining Ltd, 21 December 1987 (WAMEX Report
A22365). Map Projection: MGA94 z51S.
Table 3 – Selected sample assay results from various prospects, Zelica Project.
Prospect
Sample
Sample type
Grid
Easting
Northing
Au (g/t)
Eucalyptus Bore
KAL003939
GRAB
MGA94_51
420003
6766670
0.29
KAL003976
GRAB
MGA94_51
419982
6766684
1.08
KAL012563
ROCK
MGA94_51
420419
6761380
39.60
KAL012566
ROCK
MGA94_51
420380
6761412
0.40
KAL012567
ROCK
MGA94_51
420361
6761433
6.44
KAL012568
ROCK
MGA94_51
420321
6761423
0.50
KAL012577
ROCK
MGA94_51
420122
6762194
0.23
West Nest
Other
A high of 39.6 g/t Au (KAL012563) was returned from a vuggy quartz–k-feldspar–carbonate vein exposed
in a shallow excavation at the West Nest prospect.
Given the encouraging early results, KalGold is determining the most appropriate way to initiate systematic
exploration of the Zelica Project. Rock-chipping was incorporated into this initial program to assist with
rock type identification and assessment of gold mineralisation potential. Only gold assays have been
returned to date. Follow up work programs are likely to include auger geochemical sampling and field
mapping to refine targets.
Page 7
Quarterly Operations Report, June 2023
EVENTS POST END OF REPORTING PERIOD
During the quarter, the Company also undertook cost-effective, systematic programs to identify further
gold targets for shallow, low-cost resources in highly prospective areas within the broader KalGold portfolio
(KalGold ASX release, 6 July 2023).
The gold and lithium work at Perrinvale and Pianto is consistent with this strategy and complements
recently announced thick, near-surface gold intercepts at Kirgella Gift (Pinjin Project) and reconnaissance
high-grade gold sampling at the Zelica Project.
KalGold also strategically pegged a new Mining Lease Application (M25/377) at its Bulong Taurus Project,
where previous work by the Company has defined a JORC Code (2012) Mineral Resource Estimate of
3.61 Mt @ 1.19 g/t Au for 138,000 oz (KalGold ASX release, 7 March 2023). KalGold envisages a future
mining operation at Bulong Taurus that simultaneously extracts gold ore from an open pit at La Mascotte
and from a series of satellite prospects surrounding it.
Perrinvale
The Perrinvale Project is located on the Zuleika-Ballard Shear Zone, a known conduit for gold-mineralising
fluids over the Kundana and Mungari Goldfields near Kalgoorlie-Boulder, and at the Mt Ida Goldfield to the
south of Perrinvale. Nearby, gold mineralisation at the Matisse and Quinn Hills prospects on the structure
to the south and at Ida Valley to the north has been recognised in recent years.
Previously unrecognised, gold-mineralised, outcropping quartz veining was identified at Perrinvale during
the quarter, confirming the presence of primary orogenic gold mineralisation in the project area. Results
returned post-reporting period recorded up to 4.08 g/t Au in an unmapped area north of and along strike
from historic gold auger geochemistry anomalism at the Pine Well gold target. All samples collected from
quartz veining contained gold (Table 4), with only background values recorded in country rock beyond its
limits.
Table 4 –Sample assay results from quartz vein outcrops, Pine Well North, Perrinvale Project.
Prospect
Sample
Sample type
Tenement
Grid
Easting
Northing
Au (g/t)
Pine Well North
S302498
ROCK
E29/1006
MGA94_51
252319
6816656
4.08
KAL012526
ROCK
E29/1006
MGA94_51
252322
6816658
2.39
KAL012525
ROCK
E29/1006
MGA94_51
252321
6816656
1.88
KAL012530
ROCK
E29/1006
MGA94_51
252325
6816656
1.83
KAL012527
ROCK
E29/1006
MGA94_51
252322
6816657
1.50
KAL012529
ROCK
E29/1006
MGA94_51
252323
6816656
1.32
KAL012528
ROCK
E29/1006
MGA94_51
252322
6816656
0.66
KAL012523
ROCK
E29/1006
MGA94_51
252319
6816655
0.18
This discovery defines gold anomalism over at least 3.5 km of strike in the Pine Well area and is open
along strike to the north and south.
In 2022, KalGold commissioned a heritage survey over the Pine Well and Zuleika Trend areas at
Perrinvale, receiving clearance to undertake field exploration activities over the project areas (ASX
announcement, 10 November 2022).
Page 8
Quarterly Operations Report, June 2023
Figure 6 – Outcropping quartz vein and scree at Pine Well North.
Figure 7 – Pine Well North outcropping quartz vein location, at the
northern end of the Pine Well target area.
Pianto – Lithium exploration
Rock chip assay results from limited areas of outcrop peripheral to previously defined auger lithium
pathfinder anomalies under shallow cover returned low-level lithium anomalism, consistent with the
presence of proximal targets beneath cover (KalGold ASX release, 23 February 2023).
More importantly, geochemical criteria from rock chip sampling provide strong indications for lithium
mineralisation in the area. The data unequivocally supports moving to the next phase of exploration – an
inexpensive aircore program to test defined targets under cover.
KalGold’s analysis of the new rock chip assay data shows samples indicative of lithium prospectivity
throughout the sample set. Prospectivity ranking is defined from 6 criteria based on geochemical ratio
thresholds for magnesium/lithium, aluminium/gallium, rubidium/strontium, potassium/barium,
potassium/sodium, and strontium/yttrium ratios. Prospective samples are peripheral to previously defined
auger target areas under cover but interestingly, are also evident beyond the footprint of the initial auger
survey. Of the 60 rock chip samples that returned useful data:
•
•
•
19 are classified as Most Prospective (where 4 or more ratio criteria are true)
11 are classified as Moderately Prospective (3 criteria true)
9 are classified as Prospective (2 criteria true).
Page 9
Quarterly Operations Report, June 2023
This equates to 65% of the samples showing lithium prospectivity, and 32% considered most prospective.
Relative proximity to previously defined, auger lithium pathfinder target areas will be used to help define
an aircore drill program at Pianto.
Figure 8 – Lithium prospectivity in outcropping rock chip samples peripheral to the previously defined covered auger lithium
pathfinder targets (pink outlines). The new data validates the earlier auger data, providing impetus to advance to the next
stage of exploration (aircore drilling).Projection MGA94_51.
Page 10
Quarterly Operations Report, June 2023
Bulong Taurus
New Mining Lease Application (MLA) at Bulong Taurus
KalGold pegged a new Mining Lease Application (M25/377) at its Bulong Taurus Project, where previous
work by the Company has defined a JORC Code (2012) Mineral Resource Estimate of 3.61 Mt @ 1.19 g/t
Au for 138,000 oz (KalGold ASX release, 7 March 2023).
Figure 9 – A new MLA (blue outline) has been submitted to the DMIRS surrounding the existing M25/19 lease over La Mascotte.
Goldrush era (1890-1925) mining areas (red) and more recent discovery areas (yellow brown), show the present
understanding of the distribution of gold mineralisation at and around the Bulong Taurus project area. The MLA enables
simultaneous mining of these areas with an open pit operation at La Mascotte, and will prompt expansion of resources at
the Bulong Taurus Project. Projection MGA94_51.
KalGold envisages a future mining operation at Bulong Taurus that simultaneously extracts gold ore from
an open pit at La Mascotte and from a series of satellite prospects surrounding it. To this end, KalGold
has submitted a MLA over the greater Bulong Taurus Project area to WA’s Department of Mines, Industry
Regulation and Safety (DMIRS). Grant of the new Mining Lease will allow the Company to continue to fully
assess all satellite prospects, define additional Mineral Resources and undertake all required mining
studies.
Page 11
Quarterly Operations Report, June 2023
Forthcoming KalGold work programs will seek to drill out and define additional gold mineralisation along
strike, and into the footwall and hanging wall of the La Mascotte system, as defined by the series of satellite
prospects evident from KalGold’s 2022 drill programs. These targets, namely Turnpike, Thruxton, and
Bonneville, are located on current prospecting licences surrounding M25/19 (host to La Mascotte). The
Royal Star prospect to the east of La Mascotte, together with a series of Gold Rush era (1890-1925)
prospects defining a west-northwest line of historic workings between Victoria and Planimeter will also be
further assessed (Figure 13).
The new MLA measuring 693 hectares in size will replace several prospecting licences completely, several
others partially, and will overlap but not replace M25/19 (which is to be excised). KalGold will inform the
market as the MLA progresses towards granting.
CORPORATE
Placement & SPP
In May 2023, the Company strengthened its balance sheet via a two-tranche Placement raising $1.4 million
(before costs) through the issue of 43.75 million shares at an issue price of $0.032 per share. 1 The
Placement included a one (1) for one (1) free-attaching unlisted option exercisable at A$0.06 and expiring
24-months from the date of issue. The options received shareholder approval at a General Meeting held
on 19 July 2023.
In addition, the Company also raised $730,000 (before costs) via a heavily oversubscribed Share
Purchase Plan (SPP) to eligible shareholders with the company receiving valid applications for 22,812,500
shares.2
Funds from the placement and SPP are earmarked for systematic drilling and assessment of Pinjin,
including:
•
•
•
Extension of shallow, high-grade gold mineralisation at Kirgella Gift;
Infilling the 500m gap between Kirgella Gift and Providence to test continuity; and
Assessment of other established targets, including T12, T15, Wessex, and the Harbour Lights
extension, as well as a series of newly defined targets.
Finance and Use of Funds
The Company’s cash position was $1.5M at 30 June 2023 with no debt and issued capital of 107,771,025
shares, 20,031,950 Options and 744,827 Performance Rights. Following the successful $1.4 million
placement and $730,000 SPP as at 31 July 2023 the company had over A$2.65 million in cash.
Expenditure incurred on exploration activities during the quarter was approximately $489,000. No
expenditure was incurred on mining production or development activities.
Payments totalling approximately $101,000 were made to related parties of the Company, as shown in the
attached Appendix 5B comprising directors’ fees of $30,000 and salary of $71,000.
1
See KalGold ASX release - $1.4m institutional share placement and $0.5m SPP – 24 May 2023
- Share Purchase Plan Results SPP Offer Oversubscribed - 30 June 2023
2 See KalGold ASX release
Page 12
Quarterly Operations Report, June 2023
Pursuant to ASX listing rule 5.3.4, the Company provides a comparison of its actual expenditure against
the estimated expenditure on items set out in the Company’s Pre-Quotation Disclosure Document.
Use of funds
Funds Received
from prospectus
Actual to Date
Variance
$
$
1,100,000
1,109,637
(9,637)
-
(680,000)
680,000
386,000
386,000
452,454
(66,454)
100,000
100,000
100,045
(45)
4,900,900
3,883,933
3,518,226
365,707
1,000,000
833,333
1,531,700
(698,367)
7,486,900
6,303,266
6,032,062
271,204
$
Repayment to Ardea of IPO, exploration
costs pursuant to the Loan Agreement
1,100,000
Capital raising
Capital raising fee
Payment to unrelated vendor
Exploration Programs
Tenement costs, administrative costs and
working capital
Total Funds allocated
Forecast
Expenditure to
Date
$
Authorised for lodgement by the Board of Kalgoorlie Gold Mining Limited.
For further information regarding KalGold, please visit kalgoldmining.com.au or contact:
Matt Painter
Managing Director and Chief Executive Officer
Tel +61 8 6002 2700
Page 13
Quarterly Operations Report, June 2023
About KalGold
ASX-listed resources company Kalgoorlie Gold Mining (KalGold, ASX: KAL) is a proven, low-cost gold
discoverer with a large portfolio of West Australian projects, focussed on:
•
The Bulong Taurus Project, 35km east of KalgoorlieBoulder, contains the outcropping La Mascotte gold
deposit as well as a series of satellite prospects and
historic workings of the Taurus Goldfield. Importantly,
KalGold’s methods resulted in the definition of a JORC
(2012) Mineral Resource Estimate (3.61 Mt @ 1.19 g/t
Au for 138,000 oz3) that is one of the most inexpensive
in recent times (A$4.60 per ounce of gold). Exploration
work continues at the project.
•
The Pinjin Project within the 30Moz Laverton
Tectonic Zone (host to Sunrise Dam, Granny Smith,
Rebecca, Anglo Saxon, and Wallaby projects) is
located only 25km north along strike from Ramelius
Resources (ASX: RMS) Rebecca Gold Project. With
historic work identifying open gold mineralisation from
shallow levels, immediate work is focused on testing
mineralisation continuity. At Kirgella and Pinjin South,
tenure is the subject of a farm-in over the next two
years to expand upon known mineralisation. Between
this tenure and KalGold’s existing tenure and
applications, the Company has established a
significant presence in a strategic and important
region.
•
Other projects are the focus of early-stage exploration
programs. Gold anomalism and recent discoveries are
driving efforts at Perrinvale and Zelica, and underexplored parts of the Keith-Kilkenny Tectonic Zone are
being examined. Additionally, lithium potential is being
tested at the Pianto and Pinjin projects.
Follow KalGold on social media
3
See KalGold ASX release, “La Mascotte gold deposit: First JORC (2012) Mineral Resource of 138,000 oz Au”. 7 March 2023.
Page 14
Quarterly Operations Report, June 2023
CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements and forward-looking information within the meaning of applicable
Australian securities laws, which are based on expectations, estimates and projections as of the date of this news release.
This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to
management’s expectations with respect to, among other things, the timing and amount of funding required to execute the
Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any
changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits,
certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s
properties, environmental risks, the availability and mobility of labour, the focus of the Company in the future, demand and market
outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise
funding privately or on a public market in the future, the Company’s future growth, results of operations, restrictions caused by
COVID-19, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”,
“expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking
information is based on the opinions and estimates of management at the date the information is given, and on information
available to management at such time.
Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results,
performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These
factors, including, but not limited to, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company
to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls,
regulations, political or economic developments in Australia or other countries in which the Company does business or may carry
on business in the future, operational or technical difficulties in connection with exploration or development activities, employee
relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing
quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent
risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and
other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and
flooding, limitations of insurance coverage and the possibility of project cost overruns or una
Share your feedback
Discover